Steam atomizing burner

Required modification of Burner/control system

Load control modification with external signal processing unit, adjustment of post purge timer. Recommission on MGO.

Recommendation for burner

Test flame pick up on MGO and replace non-responding and IR-type flame sensors.

Fuel supply system and change over automation

Install new MGO fuel line with automatic change over. Alternatively the existing line can be modified to operate on MGO, but this is not recommended unless space does allow for a new line.

Rotary cup burner

Required modification of Burner/control system

Adjust oil pressure.

Recommendation for burner

Test flame pick up on MGO and replace non-responding and IR-type flame sensors. for burners used for inert gas generation, a load control modification is required.

Fuel supply system and change over automation

Install new MGO fuel line with automatic change over. Alternatively the existing line can be modified to operate on MGO, but this is not recommended unless space does allow for a new line.